Roofing Risk Assessment and Safety Plan
A risk inventory and practical site safety plan identify roofing hazards before crews arrive. Checklists help organize information but do not replace the employer's legal responsibility for safe work.
FLAT ROOF · SAFETY, WIND & SOLAR
A risk inventory and practical site safety plan identify roofing hazards before crews arrive. Checklists help organize information but do not replace the employer's legal responsibility for safe work.
Record site, tasks, hazards, exposed people, controls, owners, emergency procedures and inspections. Cover falls, hot work, lifting, weather, electricity, public exposure and roof structure. Reassess when conditions change.
Describe the site and job
Record address, roof height, access, occupancy, fragile areas, surroundings, expected work and crews. Include people working or passing below.
Use the roof survey and working-at-height guidance as inputs.
Identify likely hazards
Consider edge falls, openings, falling tools, lifting, heavy loads, fire, electrical systems, weather and vehicle routes.
Solar jobs also introduce cables, PV electrical equipment, mounting positions and structural loads. See PV on flat roofs.
Assign controls and owners
First seek safer work methods and workplace design, then collective barriers, adequate access, inspections, supervision and training.
State who checks controls and what evidence is needed before each work phase starts.
Legal duties cannot be delegated to a generic digital checklist.
Set emergency and change procedures
Plan emergency access, communications, fall rescue and responses to storms, damaged decking or unexpectedly energized equipment.
Repeat risk checks after material changes to personnel, method, deck or weather, and update project scheduling.
Build a traceable roofing estimate
Use supported DakCalc tools for roof quantities and costs. DakCalc does not certify wind loads, solar ballast, structural capacity or fall-protection plans; these require appropriate qualified design and verification.
Open DakCalc →Related safety and solar guides
Also see: roofing work preparation · flat roof calculations.
Frequently asked questions
Is an online checklist a complete risk assessment?
No. The required assessment must fit the specific employer, duties and site.
When must the site plan be reviewed?
Whenever hazards, methods, team, weather or construction conditions change.
Who is responsible?
The employer and other legally responsible parties within their respective roles.
Sources and standards
- Arboportaal — Werken op hoogte
- Arboportaal — Wettelijke maatregelen tegen valgevaar
- RVO — Geschikte daken voor zonne-energie
- RVO — Veiligheid en verzekerbaarheid zonnepanelen
- IPLO — Noodafvoer en wateraccumulatie
- NEN 7250:2021 — Bouwkundige aspecten zonne-energiesystemen
- NEN-EN 1991-1-4:2026 — Eurocode windbelasting (controleer toepasselijke Nederlandse normeditie)
This guide is informational, not engineering approval or a safety instruction. Confirm applicable standards and national annexes, structural design, manufacturer installation guidance, site risk assessment and insurer requirements.