ISDE Roof Insulation Product Codes and Evidence
An ISDE product code identifies an insulation product in the Dutch RVO register. Roofing contractors should document the exact variant, board thickness, thermal value and eligible application before a homeowner applies.
ROOF INSULATION · SUBSIDIES, BBL & ENERGY
An ISDE product code identifies an insulation product in the Dutch RVO register. Roofing contractors should document the exact variant, board thickness, thermal value and eligible application before a homeowner applies.
Find the product on the current RVO insulation code list. Check brand, variant, minimum thickness and category; preserve exact information on the invoice and job record. A code alone never guarantees eligibility.
Match the exact material
RVO lists manufacturers, product variants, codes and applicable minimum performance. Similar products or other thicknesses need not share eligibility.
Confirm that the code applies to roof insulation and the relevant property category.
Verify minimum thickness and Rd
For ordinary existing-home roof insulation, RVO sets newly installed material Rd at least 3.5 m²K/W. A product listing does not excuse using the correct supplied thickness.
Compare order records and installation evidence with the Rd calculation.
Preserve invoice and installation evidence
RVO requests invoices, payment evidence, an identifiable installation photograph and contractor/product information. Keep the code and installed roof area readily identifiable.
Recheck the register before claiming
Subsidy lists and conditions may change. The homeowner should submit their own final application to RVO.
Neither an invoice nor a product code guarantees a grant.
From roof measurements to a traceable estimate
Use DakCalc’s existing material, quantity and cost workflows. Subsidy eligibility, statutory Rc compliance and energy savings are not automatically certified.
Open calculator →More insulation guides
Additional technical reading: PIR, EPS and tapered insulation · roof renovation.
Frequently asked questions
Should the code be shown on the invoice?
RVO needs it for the application; including it on the invoice aids documentation.
Do all PIR boards share one code?
No. Verify exact brand, model and thickness.
Does the code guarantee a grant?
No. Area, installation, ownership and evidence conditions also matter.
Official sources (check for updates)
Content reviewed 13 November 2026. This information is not regulatory or engineering approval. Rates and rules can change; verify eligibility, evidence, moisture safety and structural suitability per project.