Flat Roof Wall Flashing: Lead, Bars and Repairs

Flat-roof wall junctions may require repairing existing lead, chasing in new lead flashing or using a termination bar. These methods require different materials and labour.

FLAT ROOF TECHNOLOGY · DAKCALC KNOWLEDGE HUB

Flat-roof wall junctions may require repairing existing lead, chasing in new lead flashing or using a termination bar. These methods require different materials and labour.

Quick answer

Measure wall-junction length and select the method first. Only then count lead, lap materials, stainless-steel clips, mortar or compatible sealant as appropriate.

Assess existing flashing

Inspect cracking, deteriorated lead, failed clips, open pointing and moisture paths before selecting a repair.

Replacement is appropriate where remaining material or detailing cannot provide a durable repair.

Practical tip

Record the chosen workflow and measured junction.

Install new chased lead

An appropriate chased detail may use lead strips secured with compatible stainless-steel clips.

Count the specified lead roll width, joins and cutting allowance, plus suitable joint mortar for repointing.

Practical tip

250 mm lead is an example size rather than a universal detail.

Use a termination bar where specified

A termination bar mechanically restrains the intended membrane junction on a suitable substrate.

Specify correct fixings and compatible sealant. Mortar repointing is not automatically part of this method.

Practical tip

Check membrane and sealant compatibility.

Repair existing lead and pointing

Where technically acceptable, suitable bituminous self-adhesive repair tape may address limited local defects.

Calculate cleaning, preparation, repair tape and the optional removal/repointing of loose mortar as distinct quantities.

Practical tip

See the detail schedule.

DAKCALC

Estimate roofing work with a clear material schedule and cost breakdown

Prepare an initial calculation and verify dimensions, materials, labour and prices before issuing documents.

Open calculator →

Explore the DakCalc flat-roof calculation cluster

Start with the calculation hub, three pillars and practical guides for insulation, membrane quantities and roof details.

Frequently asked questions

Is silicone always used with chased lead?

No; mortar-pointed lead and sealed termination bars are distinct details.

Can damaged lead be repaired?

Sometimes, if material and substrate permit a durable repair.

Is 250 mm lead a universal width?

No, dimensions must suit the specified connection.

Sources and further reading

Reviewed in November 2026. Check current rules and software capabilities before relying on them.

  1. Vakrichtlijn gesloten dakbedekkingssystemen 2025 – VEBIDAK, DAKMERK, Kiwa BDA
  2. RVO – Energieprestatie-eisen verbouw en renovatie
  3. IPLO – Energiezuinigheid bij nieuwbouw
  4. IPLO – Noodafvoersysteem platte daken

General information and illustrative calculations, not personalised legal, tax or technical advice.