Write a Flat Roof Renovation Quotation

A flat-roof renovation quotation should explain what will be retained, stripped and newly installed. It should also disclose which risks cannot be excluded until the existing roof is

FLAT ROOF · RENOVATION & OVERLAYS

A flat-roof renovation quotation should explain what will be retained, stripped and newly installed. It should also disclose which risks cannot be excluded until the existing roof is opened.

Quick answer

Record roof area and existing layers, chosen method, demolition, insulation, membranes, junctions, labour, safety, disposal, price, VAT, timing and exclusions. Agree a clear authorization process for hidden damage and additional work.

Describe verified survey findings

Record the property, roof sections, inspection date and known assembly. Say whether moisture assessment, test cuts, asbestos checks and decking investigations have been done or remain outstanding.

Do not imply the full assembly is sound when it has not been investigated. Explain why recovering or replacing is proposed.

Itemize the scope of work

Separate safety and access, removal, waste, substrate preparation, new vapour control and insulation, membranes, edge and upstand strips, wall flashings and final checks.

Reference the material schedule for quantities and technical assumptions.

State costs, programme and conditions

Build price from materials, labour, access, transport, disposal and business markup. Give an appropriate validity period, proposed dates, payment terms and VAT under the applicable rules.

See renovation costing and the general roofing quotation guide. Avoid unverified promises about subsidies or warranties.

Agree variations before starting them

Opening the roof may expose wet insulation, rotten decking or other defects. Clearly define excluded work and require approval of scope and price before additional repairs.

An illustrative clause: 'Repairs to concealed layers will be separately described and priced for written authorization before execution.'

Practical note

A quotation describes work and price; it is not an independently certified roof design.

DAKCALC

Prepare a traceable renovation estimate

Measure roof areas and junctions, prepare a materials list and estimate hours and costs. Verify the real roof build-up and product requirements before work.

Open the calculator →

More on renovation and roof systems

For the repair-versus-renovation decision: overlay or replace?.

Frequently asked questions

Should a quotation mention hidden moisture risk?

Yes. Explain inspection limits and how unexpected findings will be handled.

Can recovering and replacement share one total?

Where both are offered, provide separate scopes and prices.

Is an itemized materials list useful?

Yes. It helps customers and contractors understand quantities and exclusions.

Sources and reference material

  1. Vakrichtlijn gesloten dakbedekkingssystemen 2025 — DAKMERK, VEBIDAK en Kiwa BDA
  2. Milieu Centraal — Asbestdak: herkennen en veilig laten verwijderen
  3. Afvalscheidingswijzer — Dakbedekking, bitumen en teer
  4. RVO — ISDE en actuele isolatievoorwaarden

Examples are illustrative. Roof build-up, moisture, structural capacity, wind loading, fire safety, waste classification and membrane specifications require project-specific checks.